ACDC Projects
Veolia

Veolia

Veolia

Veolia  were extremely impressed with the quality of the workmanship and the level of professionalism displayed by Michael and his team at ACDC Motorized Solutions. ACDC Motorized Solutions installed new Boom Gates onsite at our waste facilities sites at Banksmeadow and Port Botany. The job was done on time and on budget and we are extremely happy with the end result .I  would have no hesitation in recommending ACDC Motorized Solutions .

Bob Manevski

Veolia Facilities Manager-Banksmeadow and Port Botany

ACDC Motorized Solutions Pty. Ltd.
2019-03-26T14:59:12+11:00

Bob Manevski

Veolia Facilities Manager-Banksmeadow and Port Botany

Veolia  were extremely impressed with the quality of the workmanship and the level of professionalism displayed by Michael and his team at ACDC Motorized Solutions. ACDC Motorized Solutions installed new Boom Gates onsite at our waste facilities sites at Banksmeadow and Port Botany. The job was done on time and on budget and we are extremely happy with the end result .I  would have no hesitation in recommending ACDC Motorized Solutions .
Recent Projects

Combi 787

Acdc Motorized Solutions supplied and installed new Combi 787 swing gate operators . These units were retro fitted to existing gates that had old in ground motors. The project required the existing driveway to be cut to accommodate the new housing. All of this was done without damage to the existing cobble stone driveway. The…

Bayt 980 Boom Gate

ACDC has supplied and installed two Bayt 980 Vandal proof boom gates to Western Sydney Parklands Trust, these Bayt 980 boom gates have modified arms with a 4.5 mm wall thickness and take a 500kg magnet to the end of the boom arm to provide added security, ensuring that the customer has piece of mind…